Efacec Fortifies Bissau’s Electrical Output

June 14, 2017
Efacec Fortifies Bissau’s Electrical Output

Efacec Fortifies Bissau’s Electrical Output

By Modupe Gbadeyanka

Efacec won the international public tender, promoted by the public company Eletricidade e Águas da Guiné-Bissau (EAGB), for the construction of essential infrastructure to double the current installed electrical capacity of Bissau.

The contract, worth €10 million, includes the construction of two substations and a 6.2 km long line to link the new thermal power station, which will be built in Bor, to the capital of Guinea-Bissau.

The infrastructure to be built by Efacec is a key step in the Bissau electrification architecture. In addition to doubling the current capacity of the capital, it will make it possible to provide electricity to broader group of population, raising living standards and making a significant contribution to the socio-economic development of this African country.

The two substations, with 30 by 10 kV capacity, to be built in Bor and Bra regions, and the energy evacuation system, with a 63 kV capacity, are a precondition for the execution of the second module from Bissau’s electrical project that includes the construction of a power plant with a 100 megawatts capacity at Bor.

Efacec is a Portuguese company with a strong international presence that produces products for power transmission and distribution (adapters, service, high and medium voltage switchgear and automation gear) for the Energy, Environmental, Industry and Railway sectors and develops solution for Electrical Mobility, namely an energy charging system.

Efacec develops its activity in strategic markets, such as Spain, Central Europe, United States, Latin America, Brazil, Maghreb, Southern Africa and India.

Modupe Gbadeyanka

Modupe Gbadeyanka is a fast-rising journalist with Business Post Nigeria. Her passion for journalism is amazing. She is willing to learn more with a view to becoming one of the best pen-pushers in Nigeria. Her role models are the duo of CNN's Richard Quest and Christiane Amanpour.

Leave a Reply

Ejigbo NNPC Depot Shut Down over Missing Petrol
Previous Story

Ejigbo NNPC Depot Shut Down over Missing Petrol

VAT Nigeria Tax hike
Next Story

FG Generates N204.8b from VAT in Q1 2017

Latest from Economy

Don't Miss