Connect with us

Auto

Lagos Red Rail Line to Begin Full Passenger Operations October 15

Published

on

Lagos red line rail

By Adedapo Adesanya

The Lagos State Government has announced that the Red Rail line will begin full passenger operations on Tuesday, October 15, 2024.

This was disclosed by the Managing Director of the Lagos Metropolitan Area Transport Authority (LAMATA), Mrs Abimbola Akinajo.

“Full passenger operations on the Lagos Rail Mass Transit (LRMT) Red Line will commence on Tuesday, October 15, 2024, Managing Director of Lagos Metropolitan Area Transport Authority (LAMATA), Engr. Abimbola Akinajo affirmed today,” a public notice from the agency read.

According to LAMATA, Governor Babajide Sanwo-Olu, members of his executive council, and other dignitaries will launch the passenger operations and ride with commuters on the first fee-paying passenger trip.

Mrs Akinajo said that train services would commence daily from Agbado at 6.00 am.

“Before now, trips have emanated from Oyingbo at 9.00 am. The first train therefore got to Agbado at 10.07 am. The adjusted timetable foreshadows upcoming commercial passenger operations commencing on Tuesday, 15th October 2024,” the agency said.

He explained that the new timetable was the outcome of data gathered through the series of tests, including that for the non-fee-paying passengers. According to him, the new timetable gives priority to the origin trips from Agbado where riders live and work at Ikeja, Oshodi, and Lagos Island.

“For passengers whose journeys terminate on Lagos Island, buses will be available at Oyingo bus terminal for them to complete their journeys,” LAMATA said.

“It would be recalled that infrastructure for the Red Line was commissioned by President Bola Ahmed Tinubu on 29th February 2024. The Red Line’s first phase spanning 27 kilometres has eight stations at Oyingbo, Yaba, Mushin, Oshodi, Ikeja, Agege, lju, and Agbado.”

Adedapo Adesanya is a journalist, polymath, and connoisseur of everything art. When he is not writing, he has his nose buried in one of the many books or articles he has bookmarked or simply listening to good music with a bottle of beer or wine. He supports the greatest club in the world, Manchester United F.C.

Advertisement
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Auto

Dangote Cement Empowers Drivers, Riders With Life-Saving Kits in Ogun

Published

on

Dangote Cement Life-Saving Kits

By Aduragbemi Omiyale

As part of its efforts to ensure smooth festive period, the Ibese Plant of Dangote Cement Plc in Ogun State at the weekend distributed some life-saving kits to motorcycle riders and commercial drivers in the Gateway State.

Some of the items given to the commercial drivers and riders included helmets, reflective jackets as well as safety goggles.

The company said road safety campaign, which happened at the Ilaro Motor Park, was to curb preventable crashes by promoting responsible driving and riding habits as vehicular traffic surges towards the year-end.

Facilitators demonstrated the four major blind spots—front, passenger side, driver’s side, and rear—using live motorcycles and a stationed truck. Riders were stunned to discover that even an attentive driver could not see them in these zones.

A staff of Dangote Cement Transport for Health, Safety and Environment, Ms Ebere Okonkwo, explained that the initiative aligns with Dangote Cement’s broader mission to promote safer roads and foster harmony between truck drivers and other road users.

“Safety is a shared responsibility. This programme teaches road users especially the drivers and riders how to identify blind spots and equips them with safety kits. It’s part of our continuous effort to save lives.

“Overspeeding, impatience, and miscalculations remain leading causes of preventable road accidents. We urge riders to prioritize safe riding habits and strictly obey traffic regulations, especially during these remaining days into the New Year when vehicular movement peaks,” Ms Okonkwo said.

The Head of Transport and Safety at Ibese Plant, Mr Peter Abuad, led a practical session on basic issues in Road safety demonstrated how the drivers and the Okada riders could identify and avoid truck blind spots.

He highlighted four critical danger zones—directly in front, both sides, and behind heavy vehicles—warning riders to steer clear during lane changes and turns.

“If you are in any of these blind spots, the truck driver does not know you’re there. Avoid them at all times. Dangote Cement Ibese is committed to ensuring safety and improving lives,” he stated.

The Unit Commander of the Federal Road Safety Corps (FRSC), Sulaiman Kolawole Oluwadumiye, warned that excessive speed remains a leading cause of fatal crashes.

“Speed is sweet—the engine sounds powerful, the road looks open, and you feel in control. But the same speed that feels good for one minute can destroy a family in another second.

“The road has no respect for confidence or experience. There is no medal for the fastest driver and rider, only sorrow for the careless one,” he said.

He explained that speeding reduces a rider’s ability to spot danger and brake effectively, noting that articulated trucks pose even greater risks when control is lost.

“Most crashes involving motorcycles and trucks happen because riders unknowingly enter these danger zones,” he said, recounting a recent fatal crash caused by a rider overtaking on the wrong side and disappearing into a truck’s blind spot.

One of the beneficiaries of the programme, Mr David Odumoye thanked the management of Dangote Cement for deeming it fit to come to the park to meet the drivers and riders and enlighten them on road safety issues and donating safety items to them, adding, “Nobody is an expert on the road, no matter how long you’ve been riding. This training is very important. We thank Dangote for the initiative and the protective kits.”

Continue Reading

Auto

inDrive Backs Smart Mobility Innovation With AOT Lagos 7.0 Sponsorship

Published

on

inDrive The Heart That Drives Us

By Modupe Gbadeyanka

The 2025 edition of the Art of Technology (AOT) Lagos is going to be bigger and better with the inclusion of inDrive as its official sponsor.

The AOT Lagos 7.0, themed Future Technologies and a Sustainable Lagos, is scheduled for Thursday, December 4, 2025, at the Landmark Centre, Lagos.

inDrive, a leading global ride-hailing platform operating in nine African countries, is partnering with the Lagos State government to bring together policymakers, innovators, tech founders, investors, and global industry leaders to shape the future of technology and digital transformation in Lagos.

Through this collaboration, inDrive aims to contribute to high-level conversations on driver empowerment, sustainable transport models, safety, and affordability, key challenges affecting millions of daily commuters and mobility service providers in the state.

According to the Country Representative of inDrive Nigeria, Mr Timothy Oladimeji, the sponsorship underscores the company’s deep commitment to advancing equitable mobility systems and supporting conversations that drive long-term impact across the transportation ecosystem.

He noted that inDrive sees AOT Lagos as a critical platform for addressing mobility challenges and accelerating innovation within the state.

During the event, inDrive will be participating in one of the key sessions, discussing the topic From fuel to future: the rise of e-mobility in Lagos.

Aside from this, inDrive will also be hosting a side workshop themed The Market Share Victory – How inDrive Became Nigeria’s Second-Largest Ride-Hailing Player.

“We are proud to sponsor AOT Lagos 7.0 because it aligns perfectly with our vision to democratise mobility and ensure fairness for both drivers and riders.

“As Lagos moves toward a smarter, more sustainable mobility future, inDrive is committed to supporting solutions that prioritise affordability, safety, driver empowerment, and technological readiness.

“Through this partnership, we hope to contribute meaningfully to shaping policies and ideas that will redefine how millions of people move across the state,” he said.

Now in its seventh edition, AOT Lagos has evolved into a premier platform for advancing smart-city innovation, showcasing emerging technologies, and influencing the policy frameworks that shape the digital economy in Africa’s largest city.

Continue Reading

Auto

FG to Open Section of Lagos-Calabar Coastal Highway December 12

Published

on

Lagos-Calabar Coastal Highway

By Adedapo Adesanya

The federal government is set to open Section 1 of the 700 km Lagos-Calabar Coastal Highway for public use from December 12 to 17, 2025.

The Minister of Works, Mr Dave Umahi, gave the assurance on Sunday in Lagos during a review of outstanding works on Section 1 of the highway project.

The section 1 is 47.47km long and has six lanes and two carriageways.

Mr Umahi said: “We also set aside April next year to have Section 1 and half of Section 2 fully completed and commissioned,” adding that the contractor handling the project, Hitech Construction Company Limited, had achieved more than 80 per cent of the reinforced concrete pavement.

“We are very grateful to God Almighty for his mercies, and to the President and to the contractor.

“If we are to pay for everything they have done, it will be very difficult to have this job done because there are places we didn’t envisage that we were going to be removing pits up to a depth of 20 metres.

“They had to do that because they are partners in progress for the development of the country.

“We have just about three kilometres to complete the entire sand filling from Ahmadu Bello Way to Eleko Junction, and we are excited at the work and the quality of what has been done,” the former Governor of Ebonyi State, said.

The new Controller of Works in Lagos, Mr Olufemi Dare, told the minister that a lot of settling was ongoing at Chainage 33 of the highway project, praising the contractor for high quality of work.

“Sir, it may interest you to know that the building standing is the palace of this community, and you saved this building, and they are extremely happy,” he said.

On his part, the Managing Director of Hitech Construction Company Limited, Mr Dany Abboud, said that the company would still backfill from Chainage 34 to Chainage 37.

“Dredging is ongoing, we are on track to deliver.

“We are monitoring the settlement in the swampy areas and the water body areas due to the change of alignment,” he said.

The highway, which commenced construction in March 2024, has generated a lot of controversy, with critics raising concern around cost and procurement structure.

Continue Reading

Trending